Travel Information»
Incident (397408) Detail
 |
Location |
Watauga County, In Blowing Rock US-321 (US 321), Both Directions Lanes Narrowed - Expected Impact to traffic is Medium |
Start Time |
|
2/1/2012 08:00 AM |
| End Time |
|
10/1/2015 05:00 PM |
|
| Reason |
|
Construction: Lanes Narrowed |
US 321 under construction in both directions from SR 1500; Blackberry Rd in Caldwell Co. to US 221 at Shoppes on the Parkway in Blowing Rock.
www.ncdot.gov/projects/blowingrock321 Twitter feed: @NCDOT_EastMTN Project Hotline 8:00am to 5:00pm : 828-964-3260
|
Construction Days and Times: |
|
US 321 under construction, both directions, from Blackberry Rd to US 221 in Blowing Rock |
|
 |
|
All motorists are advised to follow a detour route onto US 221 and US 321 business through downtown Blowing Rock. Through truck traffic must follow the signed detour along NC 18 and US 421 in Caldwell, Wilkes and Watauga Counties. |
|
|